2026 NEC Code Adoption

9 states are on the 2026 NEC today. 1 more has adopted it with a later start date. The map and table show each state's effective date.

Checked against state sources on Nov 22, 2026. Scheduled changes switch over on their start date. Each state links to its source; cities and counties can add amendments.

Filter by Version

Quick Info

  • ▶NFPA updates the NEC every 3 years.
  • ▶Effective dates vary by state commission.
  • ▶Check local amendments for specifics.

Click a state for details

Need the Code?

Search for specific NEC articles and tables using our AI-powered code lookup tool.

NEC Code Lookup →
Loading Table...

Frequently Asked Questions

?Which states have adopted the 2026 NEC Code Adoption?

Currently, the following **9 states** have adopted the 2026 edition: Arkansas, Colorado, Maine, Massachusetts, Minnesota, North Dakota, Oregon, Texas, Wyoming.

?Is the 2026 NEC the latest edition?

Yes. The 2026 NEC (NFPA 70) is the newest edition. States adopt it on their own schedules, so check the map for your state.

?Why are some states still using older versions like 2026?

The adoption process involves legislative review, public comment, and often training for inspectors and contractors. This process can take several years, leading some states to lag behind the NFPA publication cycle.

How NEC Adoption Works

The National Electrical Code (NEC), also known as NFPA 70, is a regional standard for the safe installation of electrical wiring and equipment in the United States. While the National Fire Protection Association (NFPA) updates the code every three years (e.g., 2017, 2020, 2023), adoption is handled at the state or local level.

Statewide Adoption

Most states have a central Building Code Commission that mandates a specific version of the NEC for all jurisdictions within the state.

Local Control

States like Arizona, Illinois, and Missouri allow local counties or cities to decide which NEC version to adopt and enforce.

Amendment Variations

States often adopt the NEC with specific "amendments" or exceptions to suit local environmental or industrial needs.

Cycle Skipping

Due to legislative delays or administrative slow-down, some states may skip an entire 3-year cycle before updating.

Disclaimer: This data is for informational purposes only. Always verify code requirements with your local AHJ (Authority Having Jurisdiction).